Skip to content
🚀 Founding Member: Pro at ₹4,999/mo for the first 25 teams — code FOUNDER50
Guide

Land Acquisition in Chennai: Market Trends and Pricing

Chennai land acquisition guide for real estate teams — micro-market pricing by corridor, CMDA zoning, CRZ constraints, document requirements, stamp duty, and deal timelines.

VN

Vignesh Nagarajan

· Updated · 21 min read
Land Acquisition in Chennai: Market Trends and Pricing
On this page
  1. Chennai's Five Growth Corridors
  2. Land Price Benchmarks by Corridor
  3. Guideline Value vs. Market Value: The Chennai Gap
  4. Stamp Duty and Registration Charges in Chennai
  5. The Regulatory Stack for Chennai Land Deals
  6. Document Checklist for a Chennai Land Deal
  7. CMDA Zoning: What Land Use Means for Your Deal
  8. Coastal Regulation Zone: When It Stops a Deal
  9. Title Complexity in Chennai: Red Flags for Acquisition Teams
  10. Typical Deal Timelines for Chennai Land Transactions
  11. How Proquiro Supports Chennai Acquisition Teams
  12. Building a Chennai-Specific Acquisition Workflow
  13. Metrics Chennai Acquisition Teams Should Track

Chennai is the most operationally complex city in India for land acquisition teams — not because individual deals are harder than in other metros, but because the regulatory and document environment layers multiple overlapping jurisdictions onto every transaction. The CMDA planning zone sits inside a larger metropolitan region governed by DTCP for fringe areas; both interact with state revenue records maintained by the Tahsildar, SRO-registered title documents, and a CRZ overlay that can override everything else. Teams closing 20+ parcels per year in Chennai have mapped this complexity into a repeatable workflow. This guide provides that map: five growth corridors, pricing benchmarks by zone, document requirements, regulatory bodies, title red flags, and the deal timelines to expect in 2026.

For a high-level market overview and Proquiro’s active parcel data for the city, start with the Chennai land acquisition page.

Chennai’s Five Growth Corridors

Chennai’s land market in 2026 divides into five operationally distinct corridors, each with different price dynamics, dominant land use, and regulatory requirements. Which corridor a parcel sits in determines regulatory jurisdiction, title risk profile, and applicable pricing benchmarks — it is the first filter any screening process should apply.

CorridorKey Micro-MarketsDominant Land UsePrimary Demand DriverTypical Parcel Size2026 Price Range (₹/sqft)
OMR Phase 1Sholinganallur, Perungudi, PallikaranaiResidential, Mixed-useIT offices, infill residential2,000–10,000 sqft₹5,500–₹9,000
OMR Phase 2Siruseri, Kelambakkam, KazhipatturResidential, Low-riseIT expansion, affordable housing2,500–15,000 sqft₹2,200–₹4,800
GST Road (Southern)Tambaram, Chromepet, Guduvanchery, ChengalpattuMixed, IndustrialAirport proximity, logistics5,000–30,000 sqft₹1,800–₹4,200
Sriperumbudur–Oragadam (West)Sriperumbudur, Irungattukottai, Maraimalai NagarIndustrial, Large-parcelAuto, electronics manufacturing50,000+ sqft₹600–₹1,800
North Chennai (NH 16 / NH 716)Redhills, Thiruvallur, PonneriIndustrial, LogisticsPort hinterland, warehouse demand25,000+ sqft₹400–₹1,200

Most residential acquisition activity concentrates in OMR Phase 1 and 2, with growing interest in the GST Road belt as OMR Phase 1 prices have outpaced affordable-residential development feasibility. Industrial teams focus almost entirely on the west and north corridors, where parcel sizes above 5 acres are still available at viable rates. The corridors also correspond to distinct SRO jurisdictions — a point that matters for EC verification, because the SRO that holds historical documents for a parcel is determined by where it sat geographically when transactions were registered, not by current administrative boundaries.

Land Price Benchmarks by Corridor

Chennai raw land pricing has moved upward in every corridor since 2022. The IT infrastructure buildout along OMR, the Chennai Airport Terminal 2 opening, and manufacturing FDI in the Sriperumbudur–Oragadam belt have driven cost increases that outpace rental yield growth in several zones — a signal that acquisition teams pricing residential deals need current benchmarks, not 2023 broker conversations.

Corridor2022 Range (₹/sqft)2024 Range (₹/sqft)2026 Range (₹/sqft)2-Year CAGRPrimary Driver
OMR Phase 1₹3,800–₹5,500₹4,800–₹7,500₹5,500–₹9,00011–13%IT infrastructure infill
OMR Phase 2₹1,400–₹2,500₹1,800–₹3,500₹2,200–₹5,00012–15%Affordable residential expansion
GST Road₹1,200–₹2,500₹1,600–₹3,200₹1,800–₹4,20010–13%Airport expansion, logistics
Sriperumbudur–Oragadam₹400–₹1,000₹550–₹1,400₹600–₹1,8009–12%Manufacturing FDI
North Chennai₹250–₹700₹350–₹1,000₹400–₹1,2009–13%Port infrastructure, expressway

Methodology note: the market ranges above are indicative estimates compiled from developer-reported transactions and broker quotes during 2025–26 — they are not registry data, and individual parcels routinely fall outside these bands. Treat them as screening benchmarks; underwrite against the official guideline values and registered comparables for the specific SRO before committing.

Three observations for acquisition teams. First, OMR Phase 1 has hit development feasibility ceilings for affordable residential — most buyers underwriting land at ₹6,500+/sqft are building premium or luxury product. Second, OMR Phase 2 micro-markets show the highest pricing variance; two parcels 2 km apart can differ by 60% based on approach road quality and flood-zone proximity. Third, industrial parcels in Sriperumbudur often transact near guideline value because institutional buyers are more sophisticated and guideline values in that SRO have been revised more recently than in city-fringe zones.

Use Proquiro’s location intelligence to benchmark against live transaction data before entering price negotiations.

Guideline Value vs. Market Value: The Chennai Gap

Guideline value — the government’s minimum property valuation used to calculate stamp duty — consistently lags market value in Chennai’s high-growth corridors. The gap creates two risks for acquisition teams: sellers anchor to aspirational market prices rather than registrable values, and buyers underestimate total acquisition cost because stamp duty is always calculated on the higher of the two figures, not on the agreed price.

Zone / SROGuideline Value (₹/sqft)2026 Market Value (₹/sqft)GapStamp Duty Implication
OMR Phase 1 (Sholinganallur SRO)₹4,500–₹6,500₹5,500–₹9,00025–40%Transaction value applies; guideline is below market
OMR Phase 2 (Thiruporur SRO)₹1,800–₹3,500₹2,200–₹5,00030–50%High gap in fast-growth pockets; transaction value applies
GST Road (Tambaram SRO)₹1,500–₹3,000₹1,800–₹4,20025–45%Airport proximity drives market above guideline
Sriperumbudur (Kancheepuram SRO)₹500–₹1,200₹600–₹1,80020–50%Industrial parcels may transact near guideline; check SRO rate
North Chennai (Redhills/Ponneri SRO)₹300–₹800₹400–₹1,20030–60%Highest gap; market pricing in anticipated infrastructure

To verify the exact guideline value for a specific survey number before issuing an LOI, use the Tamil Nadu guideline value lookup. In cases where the agreed price is below guideline value — which can happen in distress sales or fragmented family parcels — stamp duty will be calculated on the higher guideline value, effectively penalizing below-market deals.

Stamp Duty and Registration Charges in Chennai

Tamil Nadu’s stamp duty structure adds 9% to every land acquisition cost, per the official TNREGINET Duty and Fees schedule. This is the most frequently miscalculated line item in LOI-stage financial modelling, most often because teams forget to apply the higher-of-guideline-or-transaction-value rule.

ChargeRateBasisExample: ₹1 Cr deal, ₹80L guideline value
Stamp duty7%Higher of transaction value or guideline value₹7,00,000
Registration fee2%Higher of transaction value or guideline value₹2,00,000
Total9%₹9,00,000

Minor computer/e-filing fees (a few hundred rupees per document) apply on top but do not move the model.

If the guideline value exceeds the agreed transaction price — which occurs on older parcels in slower-moving areas — stamp duty is calculated on the guideline value, creating a cost overrun relative to the purchase price. See the full Tamil Nadu stamp duty methodology for how the calculation works across property types. Use the stamp duty calculator to model any specific transaction before the LOI is issued — this number must be in the financial model before negotiation, not after.

The Regulatory Stack for Chennai Land Deals

No single regulatory body governs a Chennai land transaction. Every parcel sits at the intersection of at least three agencies; parcels in fringe zones, CRZ-adjacent areas, or requiring agricultural conversion interact with five or more. Understanding which body has authority over what is a prerequisite for realistic timeline estimation.

BodyJurisdictionRole in a Land DealTypical Processing Time
CMDAChennai Metropolitan Area (1,189 sq km)Land use certificate, layout approval, building plan sanctionLand use: 30–60 days; Layout: 45–90 days
DTCPTN areas outside CMDA boundaryLayout approval, NA conversion concurrence for non-CMDA zones45–120 days
Tahsildar / Revenue DeptAll rural and urban parcelsPatta mutation, A-Register update, land conversion orderMutation: 15–45 days; Conversion: 60–180 days
SRO (Sub-Registrar Office)By geographic sub-divisionSale deed registration, EC issuanceRegistration: same day; EC: instant (online)
TNRERAProjects >500 sqm or 8+ unitsProject registration before marketing30–60 days
Metro Water BoardProjects near water infrastructureNOC for large-scale development30–60 days
State CRZ AuthorityWithin 500 m of High Tide LineEnvironmental clearance for CRZ-affected parcels3–12 months

For most urban parcels inside the CMDA boundary, CMDA and the relevant SRO are the only bodies involved at the acquisition stage. DTCP adds a layer for fringe and Gram Panchayat belt parcels. Revenue department involvement is required for all patta mutations and agricultural conversion orders. TNRERA is relevant to the development project that follows acquisition, not to the land transaction itself — but timeline planning for the full development cycle must account for it.

Document Checklist for a Chennai Land Deal

A standard Chennai urban parcel requires 9–11 core documents for due diligence. Rural and fringe parcels add 2–4 additional revenue records. The timelines below assume active follow-up; passive waiting typically adds 50–100% to each SLA.

DocumentSourceWhat It ConfirmsRealistic SLA
Sale deed chain (30+ years)SRO via TNREGINET / sellerUnbroken ownership transfer1–5 days per deed
Current pattaTahsildar / TNREGINETRevenue ownership in seller’s nameInstant (online); 3–7 days offline
Encumbrance Certificate (30 years)SRO / TNREGINETNo live mortgages or unresolved chargesInstant (online EC); 1–3 days offline
FMB / TSLR sketchDistrict Survey OfficeSurvey boundary and sub-division accuracy1–3 days
A-Register extractVillage Administrative Officer (VAO)Rural land classification, Natham / agricultural status3–7 days
CMDA land use certificateCMDAPermitted use, FSI, development conditions30–60 days
NA conversion orderLocal authorityAgricultural → non-agricultural reclassificationPre-existing or 3–6 months if pending
DTCP / CMDA layout approvalDTCP or CMDASub-division and layout sanctionSeller should provide; verify authenticity
Latest revenue and property tax receiptse-District / Ward officeNo outstanding arrears1–2 days
Court attachment searchDistrict Civil CourtNo active injunction, attachment, or lis pendens3–7 days

See the full Tamil Nadu land due diligence checklist for the step-by-step document verification process. Patta and chitta verification is detailed in the patta-chitta state guide; EC interpretation is covered in the encumbrance certificate guide.

CMDA Zoning: What Land Use Means for Your Deal

CMDA’s Second Master Plan divides the Chennai Metropolitan Area into land use zones that determine what can be built, at what density, and with what setbacks. A parcel’s zone classification is the single most important planning variable — it defines whether a planned development is permissible at all, and at what FSI, before any construction-phase approval is sought.

CMDA ZonePermitted UsesFSIKey Restrictions
Residential R1Low-rise residential1.5Ground + 2 floors maximum; commercial prohibited
Residential R2Medium-density residential2.0Minimum plot 180 sqm; setback norms apply
Commercial C1Retail, office, mixed-use2.5–3.0Ground-floor retail typically mandated
Industrial I1 / I2Light and medium industry1.5Residential prohibited; noise and buffer requirements
Special Hazardous IndustryHeavy industry1.0TNPCB clearance; strict buffer from residential
Agricultural / GreenfieldAgriculture onlyN/ANo development without NA conversion + CMDA approval

The most common planning trap in Chennai acquisition: sellers market parcels in Gram Panchayat belt areas (OMR Phase 2 fringe, GST corridor outskirts) as “DTCP-approved layouts” when only the layout sub-division is approved — the NA conversion order from the local authority has not been obtained, and CMDA land use regularization has not been applied for. Buying such a parcel without verifying both approvals independently exposes the developer to a construction halt or demolition notice. The land conversion process for Tamil Nadu explains the NA conversion procedure and timeline in full.

Coastal Regulation Zone: When It Stops a Deal

CRZ constraints are the single most frequently overlooked deal-killer in Chennai land acquisition. The notification applies to all land within 500 metres of the High Tide Line (HTL) on the Bay of Bengal coastline, including the ECR corridor, the Ennore coast, and low-lying areas near the Adyar river, Buckingham Canal, and Cooum. Teams typically discover CRZ constraints 4–6 weeks into due diligence, after significant time and legal cost has already been incurred.

CRZ CategoryHTL DistancePermitted ActivityDevelopment Restriction
CRZ-I (Ecologically Sensitive Areas)HTL-defined bufferConservation only; no constructionTotal prohibition; cannot be cured
CRZ-II (Developed coastal belt)0–200m from HTLReconstruction of existing structures onlyNo new construction; no expansion
CRZ-III (Rural coast / NDZ)0–200m in No Development ZoneFishing infrastructure onlyNo development within NDZ; restricted beyond it
CRZ-IV (Lagoons, creeks, estuaries)Water body beltRegulated; case-by-caseState CRZ Authority clearance required; 3–12 months
Non-CRZ / Regulated zone>500m from HTLStandard CMDA / DTCP rules applyNormal regulatory process

Any parcel within 700 metres of the coastline — ECR, North Chennai port belt, Marina hinterland — requires a CRZ status check against the current Coastal Zone Management Plan (CZMP) before due diligence begins. The CZMP is maintained by the Tamil Nadu Coastal Zone Management Authority; it is the definitive reference, not broker disclosures or seller-provided documents. CRZ-I and CRZ-II status is not curable and will make a development project infeasible regardless of other approvals.

Title Complexity in Chennai: Red Flags for Acquisition Teams

Chennai title complexity has three historical roots: large-scale agricultural-to-residential conversion without complete revenue record updates, a volume of pre-1970s oral family partitions in older localities (Tambaram, Pallavaram, Sholinganallur), and SRO boundary mismatches that mean historical documents for a parcel may be held by a different SRO than the one currently serving that geography. The result: 25–35% of urban parcels in Chennai growth corridors carry at least one title issue requiring active remediation before registration can proceed.

Title Red FlagFrequency in ChennaiRisk LevelTypical Remediation Time
Pre-1970s oral family partition, no registered settlement deedHigh in Tambaram, Pallavaram, SholinganallurCriticalFamily settlement + court order: 3–9 months
Patta not mutated into current seller’s nameModerate across all zonesHighMutation via Tahsildar: 30–60 days
Survey number mismatch between deed, patta, and FMBCommon on sub-divided plotsHighSurvey correction or resurvey: 45–90 days
Live mortgage on Encumbrance CertificateModerateCriticalRelease deed from lender: 5–30 days if seller cooperates
Agricultural land without NA conversion orderHigh in OMR Phase 2 fringe, GST beltCriticalNA conversion: 3–6 months
CRZ constraint not disclosedModerate near ECR and Buckingham Canal beltCriticalNot curable; deal may need to be abandoned
CMDA layout approval absent on sub-divided plotCommon in Gram Panchayat beltHighRegularization: highly variable; can exceed 12 months
Outstanding revenue tax arrearsCommon in rural beltModerateClear arrears before registration: 1–2 weeks

The title risk assessment guide covers each of these signals with detection methodology and remediation paths in detail. For EC verification, the encumbrance certificate verification tool surfaces live mortgage and court attachment signals automatically.

Typical Deal Timelines for Chennai Land Transactions

Chennai deal timelines depend almost entirely on title condition and whether regulatory approvals — CMDA land use certificate, NA conversion — are already in place at the time the parcel is sourced. Teams that assume a 45-day close and encounter one missing approval regularly find themselves at 6 months with sunk legal and field costs.

Deal ProfileTotal TimelineLargest Time ConsumerMost Common Delay Cause
Clean urban plot, CMDA-approved zone, clear title45–75 daysDocument collectionDelayed seller response on parent deeds
Agricultural land, NA conversion required120–210 daysNA conversion order from local authorityGovernment processing backlog
Title defect requiring family settlement90–270 daysLegal + court filing processFamily disputes; court calendar congestion
CRZ clearance required180–365+ daysState CRZ Authority technical reviewCommittee scheduling; incomplete submissions
Large industrial parcel, multiple bodies150–365 daysCMDA + DTCP + Revenue in parallelParallel processes not synchronized
Patta mutation pending (post-death of prior owner)+60–120 days added to any aboveRevenue dept; succession certificateSuccession process; legal heir disagreements

The most reliable way to compress timelines is to identify missing approvals at the parcel screening stage — before the site visit, not during or after due diligence. Teams that screen for land use zone, NA conversion status, and EC flags before field visits consistently halve their document-collection stage. The land acquisition process guide covers the full nine-stage methodology and where each stage’s decision gate sits.

How Proquiro Supports Chennai Acquisition Teams

Chennai’s complexity is manageable when a team has the right data at each stage. The operational problems that slow Chennai deals most — guideline value uncertainty, EC and patta verification delays, CRZ status ambiguity, CMDA land use lookups — are all addressable with structured tools and automation.

StageManual ProcessWith Proquiro
Parcel screeningBroker statement + manual TNREGINET guideline value searchAuto-fetched guideline value + SRO zone + land use flag per parcel
EC verificationManual EC download, PDF reviewEC anomaly detection: live mortgage, court attachment, cross-SRO check
Patta checkTNREGINET portal search, manual cross-referenceAutomated patta name and mutation status verification
Pricing analysisBroker comps, Excel modelAI pricing layer benchmarked against guideline value and corridor data
Pipeline trackingWhatsApp threads + Excel sheetStructured pipeline with stage tracking, document checklist, field notes
Team coordinationPhone + WhatsAppTask assignment, approval tracking, audit trail across the parcel lifecycle

The location intelligence feature is particularly useful for Chennai teams benchmarking micro-market pricing before negotiations: it surfaces recent transaction data, guideline value, RERA project density, and FSI data for any survey number. Pricing decisions made with this data reduce the rate of deals lost to LOI-stage pricing gaps — the most common single cause of deal failure in Chennai outside of title defects.

Building a Chennai-Specific Acquisition Workflow

A repeatable Chennai workflow runs four phases with explicit decision gates at each transition. The gates are the point at which a deal must pass a check before advancing — moving on momentum without a gate is where most sunk costs accumulate.

Phase 1: Screening (Days 1–5). Confirm the parcel is not in a CRZ zone, Poramboke land, or agricultural status without a conversion path. Verify guideline value from TNREGINET. Run a quick 5-year EC check. Confirm the patta is in the current seller’s name. If any check fails, either resolve before advancing or drop the parcel.

Phase 2: Document due diligence (Days 6–25 for clean parcels). Collect full title chain (30+ years), 30-year EC, FMB or TSLR sketch, A-Register for rural parcels, CMDA land use certificate. Parallel task: engage a local Tamil Nadu lawyer for independent legal opinion.

Phase 3: Pricing and LOI (Days 26–35). Benchmark price against corridor data and guideline value. Model stamp duty on the higher of guideline or transaction value before the LOI figure is set. Negotiate price and payment schedule. Issue LOI only after a clean legal opinion is received.

Phase 4: Registration and mutation (Days 36–75 for clean deals). Execute sale agreement with advance. Book SRO appointment (3–7 days advance typically required). Execute registered sale deed. Initiate patta mutation within 30 days of registration.

PhaseClean-Deal DurationKey DeliverableGo / No-Go Gate
ScreeningDays 1–5Parcel viability assessmentPass: Zone clear, patta matches, no CRZ / Poramboke flag
Document due diligenceDays 6–25Complete document set + legal opinionPass: Legal opinion positive; no critical title defects outstanding
Pricing and LOIDays 26–35Signed LOI with agreed price and payment schedulePass: Price within financial model, stamp duty modelled
Registration and mutationDays 36–75Registered sale deed + mutation application filedDeal complete

Use Proquiro’s land lead management to track phase and gate status across all active parcels simultaneously — the operational failure mode in Chennai is not individual deals stalling but teams losing visibility across 15–30 active parcels with different stages and outstanding items.

Metrics Chennai Acquisition Teams Should Track

Teams operating in Chennai’s layered market need to track operational signals — not just deal count. The metrics below surface process health weeks before problems show up in the pipeline as stalled deals or missed targets.

MetricHealthy BenchmarkWarning LevelWhat It Signals
Lead-to-site-visit conversion rate30–45%< 20%Screening criteria too narrow, or incoming lead quality is poor
Document collection cycle time per parcel10–18 business days> 30 daysSellers lack document readiness; risk of losing to competing offers
Deals paused for title defects20–35% of active pipeline> 50%Targeting zones with poor title history; screening is missing early signals
Deals lost to pricing gap after LOI stage15–25%> 40%Guideline value anchoring; need market comps at LOI, not after
Lead-to-registration cycle time (clean deals)60–90 days> 120 daysProcess inefficiencies or regulatory queue buildup
Parcels flagged for CRZ or Poramboke at screeningTrack separately> 15% of pipelineTeam is investing field effort in legally non-viable parcels
Active deals across all phases simultaneously15–40 depending on team size> 60 per field executiveTeam is overloaded; document quality and follow-through will degrade

Review these metrics monthly during active acquisition periods. A spike in document cycle time (above 30 days) almost always predicts a pipeline stall 4–6 weeks downstream. A high pricing-gap loss rate (above 40%) is a signal to run guideline value checks and corridor benchmarking before issuing any LOI, not after negotiations break down.

Chennai is a market where systematic process beats local knowledge alone. The teams with the best parcel-to-close ratios in the city are not necessarily the ones with the deepest broker networks — they are the ones that screen ruthlessly, collect documents in parallel rather than sequentially, and model transaction costs before the first negotiation call.

Frequently Asked Questions

How much does land cost in Chennai for real estate development?
Chennai land prices vary sharply by corridor. OMR Phase 1 (Sholinganallur to Perungudi) runs ₹5,500–₹9,000 per sqft for development-ready plots; OMR Phase 2 and the Tambaram–GST corridor range ₹1,800–₹4,200 per sqft; Sriperumbudur and Oragadam are ₹600–₹1,800 per sqft for large industrial parcels; North Chennai runs ₹400–₹1,200 per sqft. These are 2026 market ranges drawn from developer-sourced transactions and move ±20% with parcel size, title condition, and CMDA approval status.
What documents are required for land acquisition in Chennai?
A Chennai land deal requires: sale deed chain going back 30+ years, current patta in the seller's name verified via TNREGINET, Encumbrance Certificate from the relevant SRO covering 30 years, FMB or TSLR sketch for survey verification, CMDA land use certificate for parcels within the CMDA planning area, A-Register extract for rural parcels, NA conversion order for any agricultural land, and latest tax receipts. For sub-divided layout plots, also verify the DTCP or CMDA layout approval certificate separately.
How long does a Chennai land acquisition deal take?
A clean Chennai deal — clear title, cooperative seller, no agricultural conversion, parcel inside a CMDA-approved zone — takes 45–75 days from first introduction to registered sale deed. Agricultural land requiring NA conversion adds 3–6 months. CRZ-adjacent parcels needing environmental clearance can stretch to 6–18 months. The single biggest cause of delay is incomplete document collection from sellers: budget 10–15 business days per document-request cycle.
What is the stamp duty on land purchase in Chennai?
Tamil Nadu charges 7% stamp duty plus a 2% registration fee — 9% total — on the higher of guideline value or transaction value, per the official TNREGINET Duty and Fees schedule. On a ₹1 crore transaction where the guideline value is ₹80 lakh, duty is calculated on the ₹1 crore transaction value: ₹7 lakh stamp duty plus ₹2 lakh registration fee, totalling ₹9 lakh. Use the Tamil Nadu stamp duty calculator to model your specific parcel before issuing an LOI.
Does the Coastal Regulation Zone (CRZ) affect land deals in Chennai?
Yes. CRZ notifications cover significant portions of the Chennai coastline, the ECR corridor, and low-lying areas near the Buckingham Canal and Adyar river. CRZ-I and CRZ-II parcels carry construction restrictions that can make development infeasible. Any parcel within 500 metres of the High Tide Line must be verified against the current Coastal Zone Management Plan before due diligence begins. Sellers frequently omit CRZ constraints in initial negotiations — always obtain a site survey and CZMP map independently.
Share:

Stop pricing land by gut.

Proquiro gives your team the data, workflow, and intelligence to close land deals faster.

Request a demo

The land acquisition software your team needs to close with confidence.

Start with Solo from ₹639/mo · Cancel anytime.